.png)
The Gotthard Base Tunnel, running beneath the Swiss Alps, is the longest and deepest railway tunnel in the world. Each of its two main tunnels measures 57.09 kilometers in length, and the total length of supporting underground works including cross passages and ventilation shafts reaches 152 kilometers, with the deepest point 2,300 meters below the mountain surface. Built over 17 years with a total investment of approximately 12.2 billion Swiss francs, it is designed for a maximum operating speed of 250 km/h. Since its opening, it has cut north-south rail travel time across Switzerland by about 45 minutes and greatly improved the efficiency of passenger and freight transport between northern and southern Europe. This tunnel has been officially listed by LAWRENCE WORLD RECORDS CERTIFICATION as the “Longest Railway Tunnel”.